Cleaning the site up all garbage, waste and leveling the site, and so on.
Setting out of this working by denoting the limits of the proposed building and setting out of segments and footings for the proposed development.
Removal for establishment in all dirts up to a profundity of hard strata or as indicated by the Engineer's endorsed drawings or according to soil examination report.
Filling the floor bit storm cellar with purchased out fill earth other than mud and from the quarry tidy and top layer with Quarry Dust to a thickness of 0-6" including watering and union.
The tallness of floor level will be 3'- 0"from the current street level. Auto patio and all around regions should be 2'- 0"above street level.
PCC 1:5:10 utilizing 1.5"size broken stone total as a part of establishment to a thickness of 0'- 4"
PCC 1:4:8 utilizing 1.5"size broken stone total as a part of deck of ground floor to a thickness of 0'- 4"
Giving and laying RCC 1:2:4 to the accompanying RCC segment and a duplicate of every basic attracting and points of interest to be given to
PURCHASER/PURCHASERS.
RCC Mat (Footing) of size 5'x 0'- 6"with decreasing thickness of 0'- 9"or according to Structural drawings connected.
Plinth shaft 230x300mm and will be associated with all sections
Segments of least size 230x300mm and as per outline and auxiliary subtle elements.
Lintel pillar 230x150mm and if the opening more than 6', then size of lintel shaft will be 230mmx230mm
Rooftop pillar size least of 230mm x 375mm yet shifts as per burden and auxiliary drawings.
1-1/2"thick ledge section will be accommodated all windows.
Rooftop piece in Ground floor, first floor and staircase head room chunk of thickness of 4.5"and the stature of rooftop will be 10'floor to floor.
RCC underground sump with 5"cover piece, RCC OHT, Bore well and a septic tank will be given according to basic subtle elements.
Developing stone work divider 9"for every outer divider and fundamental dividers with Brick square and 4.5"for interior parcel dividers which will be given 6mm fortification with amazed courses of action on each fourth layer.
Putting 12mm thick completed mortar for roof and hang and retires with CM 1:3 blend including platform, curing and wrapping up. Harsh mortar with wipe will be given
Putting dividers interior and outside in CM 1:5 blend with smooth completion with trowel and concrete slurry
All ground surface completions will be of Jet Branded Vitrified joint free tiles 2'x2'Design
Coated tiles of Sun Ray make or proportionate for Toilet dividers up to 7'and above kitchen stage al cycle 4'height
All Toilet floors with hostile to slip tiles 12"x 12"
Evading of 4"will be given in all rooms
staircase steps will be done with Tiles wraps up
The Kitchen Platform will be with unadulterated Black Granite piece and stainless steel sink of size 24"x 18"
One Number Loft to be given
The Main Door will be of first nature of teak wood casing and size will be 4"x 3". The primary entryway screen with Imported Malaysian teak wood board of thickness 32mm
Every one of the fittings of Main Door will be of metal and bolt of Godrej or identical with appropriate metal handle.
All other Inner door jambs are hard wood/Padauk/Kongu outlines
Every single inward entryway are 32mm thick imported standard Skin entryway screens
In corridor French Door of reasonable size will be given if required according to Architectural Design
All Doors and windows are according to drawings encased and window coating at head room
Window screens UPVC encircled and 4mm thick coating and window barbecues up to 10mm square MS bars.
The Toilet entryways will be of FRP entryways
All window openings are 4'6'' to 6' relies on upon room size and drawings
All Door fittings will be of anodized aluminum with one aldrop, one entryway plug, 2 tower jolt with appropriate make Mortise/Cylindrical Locks gave in rooms
Ventilators will be of louvered sort.
Painting – Doors and windows with 2 layers of SEP over a preliminary, Inner dividers – Two layers of Emulsion paint over a groundwork, Outer dividers with 2 layers of ACE Emulsion over a preliminary.
The downpour water down channel is of 110mm dia 4kgf PVC funnel
The dirt waste line of 110mm dia 6kgf PVC channel.
Lofts will be given over Kitchen
All Water supply and clean installations like Cp taps, Pillar cocks, Angle cocks, divider mounted EWC, Wash Basin with platforms of reasonable hues. All fittings of Metro/Water man brand and apparatuses of Parry product brand. Great nature of GI funnels for high temp water lines and blue SCH-40 PVC channels for all water lines.
Weatherproof course will be Brick jam lime concrete included with added substances having thick of 3"and completed with 9"x9"pressed tiles.
Parapet mass of 4.5"thick divider with 9"pillars to stature of 3'alround
DB Box of standard make, meter board, changes over switch and arrangement of circuit breakers will be given.
Clearing Block flooring in stopping range
Compound divider all-round to tallness of 5'from street level
All-round paver pieces will be given in difficulty territories
Over Head Tank over Head Room rooftop piece will be given.
Hidden conductor funneling will be laid for TV and Telephone with attachment at Hall, Lobby and Bed Rooms in GF and FF.
Electrical wiring framework will be 3 stage wiring with Automatic change over switch. 15A fitting for Geyser in all Toilets. The wiring will be 1/18 for light and fan point. All fan snares will be covered box sort. Covered channels with 2No light focuses, 1No fan focuses, 1No 5Amps attachment in every room will be given. Kitchen gave 2No light focuses and 1No 15 Amp attachment point. Can 1No light point and 1No Geyser point. 1No calling Bell Provision