Wednesday, 21 September 2016

SUMANGALI HOMES AVAILABLE PROJECTS| CROWN - BABU NAGAR - MEDAVAKKAM

Depiction

Our organization set up in the year 2009 with setting ourselves higher objectives and standard which precisely coordinates the prerequisites of the home purchasers. We take great consideration in the configuration, procedure, strategy and execution of the fantasy home. We painstakingly comprehend the need of the home purchaser and require amazing push to satisfy and make progress toward the perfect yield in each circumstance.

Details: Block - 1 & 2 land area 2480
                Block - 1 & 2 build up area 5180

floor view

















Block 1 Flat Area (sq.ft)   UDS        Availability
G1         950                  454.83    Available
F1         1139                  545.31    Available
F2         1202                  575.47    Available
S1         889                  425.62    Available
S2         1000                  478.76    Available



Structure

R.C.C surrounded structure with RCC segments, bars and Slabs. Block Masonry filler dividers, CCP with Ground Plus two Floor. Earth shudder safe outline.

Entryways and windows

Main passageway entryway will be of top of the line Teak both casings and shutters.Bathroom entryway will be of water verification fiber material.Bedroom entryways and different entryways will be packed wood board entryways.

Flooring

Drawing,Dining room and Other rooms will be of vitrified tiles.

Kitchen

Kitchen stage will be of high review cleaned rock top, stainless steel kitchen sink with channel board and dado around 2' 0'' tallness over the stage. Space will be given according to drawing. Reasonable opening for fumes fan will be given.

Toilets

Anti slide Ceramic tiles flooring, clay tile dado till lentel level. Covered pipes arrangements,concealed PVC funnel line of moderate watchman make for boiling point water channel line(cpvc).

Clean products and fixtures Parry ware sparkle set,Bathroom fittings-Parry ware.

Electrical

Connection with manual change over office and hid copper wiring, focuses for phone, TV, cooler, clothes washer, processor, A/C, fan and light focuses in rooms. Arrangement for inverted. McB/ELCB (Earth Leak circuit breaker),automatic bore well engine controller.

Painting

Brilla putti will be connected on the dividers of pads to have smooth surface lastly completed with one layer of acrylic preliminary and 2 layers of emulsion. The outer dividers of the intricate will be at first connected 1 layer of white cement,1 layers of groundwork and 2 layers of outside emulsion. Entryways other than passageway entryway with finish paint. Passage entryway with varnish (sealer complete)/melamine wrap up. M.S. Flame broil with one layer of preliminary and two layers of finish paint.

Wardrobe

Both sides cleaned Black cudappa section for wardrobes(7x4 size), beneath kitchen stage furthermore in racks/corners gave in kitchen.

Stair case steps and Landing area

Granite or Sabha Stone, Stainless steel hand rail for steps region.

Lift and Special amenities

Branded lift, Multipurpose corridor in ground floor, Watchman room with can office, Intercom office for every pads from the beginning, Access entryway will be given in the ground floor to counteract unapproved passage, Name Plates, Separate arrangement for electric meters in the principle board, separate arrangement for regular electric meter for normal administration and sub fundamental board in every level for brisk disconnection of supply, secured parking spot for vehicles, water reaping, Walk range in the patio.



One chime point and one light point.


One TV point, one phone point, One radio point close primary entryway, two light focuses in dividers, two 5/5 A pin points,and fan focuses at reasonable spots.


One 15A for cooler, two light focuses in divider, one 5A pinpoint. Fan focuses at appropriate spots.


Two light focuses in divider, two 5A pin focuses, one 20A point for A/C, one TV point and one phone point. Fan focuses at appropriate area. Fan and light indicates be 2-way.


Two light focuses in divider, two 5A pin focuses, one 20A point for A/C, one TV point and one phone point. Fan focuses at appropriate area. Fan and light indicates be 2-way.


One light point, one light point over wash bowl mirror, one 5A pin point and 15A point for fountain.

Normal latrine and wash basin

One light point, one light point over wash bowl mirror, one 5A pin point and 15A point for spring.


One 5A pin point, one light point and one 15A point for clothes washer.


Common light point in stairs and porch, two numbers in compound divider, focuses for pump engine sets according to promoters decision.


All switches should be measured sort.


1 15% While Booking

2 25% Land Registration

3 15% When Foundation work is started

4 15% When RCC rooftop piece of particular floor is laid

5 15% When brickwork in separate floor is initiated

6 10% When deck is initiated

7 5% When level is prepared for giving over

1 comment:

  1. I havent any word to appreciate this post.....Really i am impressed from this post....the person who create this post it was a great human..thanks for shared this with us.
    Chandeliers

    ReplyDelete